The Designers and Constructors pre-preperations
Make sure you have the following
documents:
- A Print out of all the related web
pages in this domain.
- Building plans in complete
The following systems Plans :
- Water
- Sewer
- Drainage
- Electricity
- Communication
- Gas
- Doors
- Windows
Accessories:
- Aluminum 2.5 M. ruler for horizontal
measurements.
- Vertical measurements Weights.
- Engineering corpse soldier and
builders signing string.
- Heights measurements nibbler, T
profiles, windows and doors height.
- Other mechanical tools like Saw,
Fraser Etc.
Make sure the surface is totally cleaned of damages, grades, cord Etc.
“Kirtung” was founded on an engineering concept and investment of resources
to examine the strength and stability of the product called “Kirtung” during
the search for the optimal element to stand the Israeli regulation and to be
acknowledged by the Israeli Technion as a permitted building method, all
expansive, through calculating the economic aspect for the user.
Upon receiving the structure plans in 1:50 scale, calculate the amount of
walls needed and turn to “Kirtung” to order it, the suggested amount is 4%
more then actual quantity. In wet rooms the segments will consist of 1 side
of green gypsum board. Mark the position of the electricity, with the order
you shall receive the scheme of the position of the electricity, water
pipes, communication, doors, windows Etc. The complete doors and windows
systems order can be made with the walls order and arrive the construction
site along with them. In “Kirtung”’s assembly method all the professionals
like electrician, plumber, doors assembler and other are working all
together.